%0 Research Notes %T Time consumption and productivity of excavators in forest drainage %A Salo, Hannu %D 1988 %J Suo - Mires and peat %V 39 %N 3 %U http://suo.fi/article/9642 %X The distribution of effective time, output and work quality of three medium-sized excavators were observed in a time study. The distribution of operation time and productivity were included in a follow-up study. Digging time varied between 81-91%. Average availability was 85% and the productivity/operation time 157 m/h during ditch digging. The corresponding values during ditch cleaning were 89% and 221 m/h. Keywords: Digger, ditching, effective time, excavator, operation time